Your Content Goes Here
Our customer is the world market leader in tunnel boring machines, and this application is used underground. In modern traffic tunnel construction, individual concrete segments are assembled into rings. Our customer wants to check for defects in the elements directly before the segments are installed. In close cooperation with the customer, preML developed a software solution that reliably meets these requirements.
Industry
Materials
Dimensions
Assignment
Highlight
User objectives
Customer
Construction Industry (Tunneling)
Concrete with built-in parts
2 x 3 meter
Inspection of surface (cracks, spalling), installed parts, identification
AI algorithm for crack detection in concrete with 2D cameras
Reliable control & documentation, emloyee safety, automnomous production
VMT GmbH
BLOG POSTS ABOUT THIS USE CASE (mit #Tag)
The 6th European Machine Vision Forum 2023: A Recap
The European Machine Vision Forum (EMVF) is a remarkable [...]